HRC Construction General Contractor
VALUE: $1.5 million
OWNER: BC Hydro
DATE: October 2015 to June 2016
CONSULTANT: AMEC / Foster Wheeler
SUPERVISOR: Skyler Dufort
PROJECT MANAGER: Merv Parr
DESCRIPTION: Construction of a massive blast-wall along the south side of the substation. Work took place in operating substation and required specialized pile driving techniques and concrete and steel erecting procedures. Work also included fire code upgrades and access walkways.