Projects / Substations

TransLink Rectifier Stations

HRC Construction General Contractor

VALUE: $1 million
OWNER: TransLink
DATE: April 2018 to June 2020

CONSULTANT: PBS Consulting
SUPERVISOR: Andrew Franklyn
PROJECT MANAGER: Merv Parr

DESCRIPTION: TransLink Rectifier Stations - MetroTown

K+S Potash Handling Facility

HRC Construction Subcontractor - for substations, duct banks and wastewater storage

VALUE: $5.5 million
OWNER: Pacific Coast Terminals / K+S
DATE: March 2016 thru June 2017
CONSULTANT: CH2M Hill Canada

SUPERVISOR: Skyler Dufort
SITE COORDINATION: Andrew Franklyn
PROJECT MANAGER: Merv Parr
SITE SAFETY COORDINATIOR: Shane Rodgers

DESCRIPTION: Port Moody, two new substation structures, 3KM of new duct bank, conveyor footings and wastewater systems.

Sperling Substation - Fire Protection Works

HRC Construction General Contractor

VALUE: $1.5 million
OWNER: BC Hydro
DATE: October 2015 to June 2016

CONSULTANT: AMEC / Foster Wheeler
SUPERVISOR: Skyler Dufort
PROJECT MANAGER: Merv Parr

DESCRIPTION: Construction of a massive blast-wall along the south side of the substation. Work took place in operating substation and required specialized pile driving techniques and concrete and steel erecting procedures. Work also included fire code upgrades and access walkways.

Knight Street Rectifier Station

HRC Construction General Contractor

VALUE: $450,000.00
OWNER: Translink
DATE: May to September 2012

CONSULTANT: PBX Engineering
MANAGER: Merv Parr

DESCRIPTION: remove and replace electrical rectifier station

Lynn Valley Hydro Substation

HRC Construction General Contractor

VALUE: $2.5 million
OWNER: BC Hydro
DATE: February to December 2013

CONSULTANT: AMEC
MANAGER: Merv Parr

DESCRIPTION: renovation and addition of CBs and controls

Boundary Lougheed Rectifier Station

HRC Construction General Contractor

VALUE: $450,000.00
OWNER: Translink
DATE: May to September 2012

CONSULTANT: PBX Engineering
MANAGER: Merv Parr

DESCRIPTION: remove and replace electrical rectifier station